Pennsylvania to Oregon and Washington, consolidated on our own docks and moved on our own equipment. Temperature set at pickup and visible the whole way.
From our own shipments, October 2025 to September 2026. Transit is calendar days from pickup to delivery and includes delivery appointment scheduling.
10 days
Typical, pickup to delivery. 13 days or less for 4 in 5 shipments.10 days
Typical full container, pickup to delivery. 12 days or less for 4 in 5 loads.2,860 miles
Median shipment miles on the lane.37%
Share of the lane's shipments that moved under temperature control, October 2025 to September 2026.100+
LTL and intermodal moved on this lane, October 2025 to September 2026.Pennsylvania
Handled through our Mechanicsburg, PA terminal, 6383 Brackbill Blvd.
Most frequent: Breinigsville, Mertztown, Allentown, Lancaster, Harrisburg.
Oregon and Washington
Handled through our Portland, OR terminal, 5949 N Basin Ave.
Most frequent: Everett, WA, Albany, Poulsbo, WA, Vancouver, WA, Sumner, WA, Portland.
Refrigerated or dry, on trailers and containers we own and maintain. You pick the service level; we route for it.
LTL consolidation
Refrigerated and dry less-than-truckload, consolidated at our terminals and moved on a schedule. Liftgate or dock to dock.
Intermodal
Full refrigerated or dry containers on Class I rail, with its own drayage at both ends for pickup and delivery. Truckload service at intermodal economics.
What each level means: Guaranteed, Premium and Economy. Pickup cutoffs vary by origin: call 800-501-5589.
How long does LTL take from Pennsylvania to Portland?
White Arrow LTL from Pennsylvania to Oregon and Washington took 10 calendar days from pickup to delivery on a typical shipment between October 2025 to September 2026, and 13 days or less for 4 in 5 shipments. That count includes delivery appointment scheduling at the consignee.
Does White Arrow run refrigerated freight from Pennsylvania to Portland?
Yes. White Arrow runs refrigerated and dry LTL and intermodal equipment on the Pennsylvania to Portland lane. About 37% of the lane's shipments in the last year moved under temperature control, with the reefer temperature monitored and visible throughout transit.
Is there intermodal from Pennsylvania to Portland?
Yes. White Arrow runs temperature-controlled and dry intermodal on this lane in its own containers on Class I rail, with its own drayage at both ends. A typical full container took 10 calendar days from pickup to delivery between October 2025 to September 2026, and 12 days or less for 4 in 5 loads.
How do I get a quote for Pennsylvania to Portland?
Call 800-501-5589 or request a quote at whitearrow.com/contact with origin and destination ZIP, commodity, weight, pallet count, freight class, temperature and pickup date. Signed-in customers can quote and tender in the customer portal.
More lanes from Pennsylvania
More lanes into Portland
Send origin and destination ZIP, commodity, weight, pallets, freight class, temperature and pickup date. We will come back with a rate and a date.